wheeled loader drops ballast on rail tracks, ballast, cat it38g, caterpillar, diamond crossing, front loader, gravel, high-visibility jacket, high-visibility vest, light rail, man, muni, ntk, railroad construction, railroad tracks, rails, railway tracks, reflective jacket, reflective vest, safety helmet, safety vest, san francisco municipal railway, track maintenance, track work, tracks crossing, wheled loader, workers wheeled loader drops ballast on rail tracks, ballast, cat it38g, caterpillar, diamond crossing, front loader, gravel, high-visibility jacket, high-visibility vest, light rail, man, muni, ntk, railroad construction, railroad tracks, rails, railway tracks, reflective jacket, reflective vest, safety helmet, safety vest, san francisco municipal railway, track maintenance, track work, tracks crossing, wheled loader, workers

wheeled loader drops ballast on rail tracks

Wheeled loader drops ballast on the new tracks.­

View more photos of railroad workers replacing a Muni lightrail track section on Church street in San Francisco.

178 Church St, San Francisco, CA 94114, USA

Photos of railroad workers replacing a Muni light rail track section on Duboce street, Church street and Market street (San Francisco).­

Each section of track work, such as replacement of the double diamond crossing structure at Church st and Market st, takes 2 or 3 days with crews working 24h during week-ends.­

The work was realized by local contractor NTK Construction.

I must thank NTK management and crew for letting me shoot those amazing photos on their construction site.­