worker cutting track rail with abrasive saw


Worker using a handheld cut-off saw to cut a new track rail at the right length.­

View more photos of railroad workers replacing a Muni lightrail track section on Church street in San Francisco.

abrasive saw cut-off saw cutting diamond crossing high-visibility jacket high-visibility vest huskvama K760 light rail man muni night NTK power tool railroad construction railroad tracks rails railway tracks reflective jacket reflective vest safety helmet safety vest san francisco municipal railway sparks track maintenance track work worker working
2077-2099 Market St, San Francisco, CA 94103, USA

Photos of construction workers at work, with their heavy machinery and power tools.­

Road construction, infrastructure, building constructions etc.­

Photos of railroad workers replacing a Muni light rail track section on Duboce street, Church street and Market street (San Francisco).­

Each section of track work, such as replacement of the double diamond crossing structure at Church st and Market st, takes 2 or 3 days with crews working 24h during week-ends.­

The work was realized by local contractor NTK Construction.

I must thank NTK management and crew for letting me shoot those amazing photos on their construction site.­