Share

abandoned tunnel - lanco hydro power project - teesta river - sikkim (india)

abandoned tunnel - lanco hydro power project - teesta river - sikkim (india), adit, air ducts, flooded, hydro-electric, intersection, pipes, sikkim, teesta, tista, trespassing, tunnel, urbex, wiring

Adit tunnel, part of an unfinished Hydropower project in Sikkim (India)

I was able to explore the tunnel up to a point where it was flooded (the water pumps were not functionning, but there was some electric lights). The tunnel is obviously unfinished. Not sure what this tunnel is for. I think it maybe to drive heavy equipment to the site, like turbines for the power house, since the small mountain roads cannot be used by heavy trucks.

This is part of a semi-abandoned unfinished Hydro-Power Project on the Teesta river in Sikkim (India). The project is developed by Lanco Infratech Limited.

Download Share
Interested in purchasing a Poster or Wall Print of this photo?


All Prints (Posters, Photographic and Fine Art Prints, Framed Prints, Canvas, Metal Prints, Wall-Peels, etc) are produced by Bay Photo Lab in Santa cruz, California, and ordered via their secure fotomoto service.



Prints do not have any watermarking on the image, and they are made from the high-resolution original file (xpx).

Risk-free purchase: We will do a free re-print if you are not fully satisfied by the quality of the print you ordered.

Price depends on the type of print and its size. Starts from $15.43. To view price for each print product, click on the button below to go to the order dialog:
Interested in licensing this Royalty-Free stock photo?


High Resolution (original size): xpx - Screen Size: xpx

Model Released:

License Type:

Licensed Images do not have any watermarking on the photo.

Price depends on the type of license and image size. Starts from $19.99. To view licensing prices and conditions, click on the button below to go to the order dialog:
Date